﻿# Project Request
Source: https://www.fenetresystems.com/en/project-request/

# Project Request

Orders of 20 units and above are run with the project team. The measurement list and project information are relayed in a single form.

## Directly with the Project Team

A bulk order is discussed not on the general quote line but with the team that plans production. The moment the measurement list arrives, the job takes its place on the production calendar — no middle tier, no commission layer.

250+

Completed projects

550 m²

Monthly serial production

15 years

Parts supply commitment

- A sample is sent before serial production; the approved model becomes the project standard.
- Products are labelled and packaged per block, floor or room.
- Shipment is phased-planned; international orders are delivered to the door.
- The seven steps of the process are described on the [Our Projects](https://www.fenetresystems.com/en/our-projects/#process) page.

[Phone 0540 336 3873](tel:+905403363873) [E-mail info@fenetresystems.com](mailto:info@fenetresystems.com?subject=Bulk%20Project%20Request) [WhatsApp Fast coordination line](https://www.fenetresystems.com/en/whatsapp/)

Including quantity, city and an approximate deadline in the message speeds up the evaluation.

## How Your Measurement List Should Look

A list sent in this format converts directly into a production plan. Excel or PDF is also accepted.

Sample project measurement list — block, opening, quantity and product family
Unit — Opening (W×H) — Qty — Product
Block A · 3rd floor — 120 × 140 cm — 24 — Pleated Insect Screen
Block A · 4th floor — 120 × 140 cm — 24 — Pleated Insect Screen
Block B · bathroom — 60 × 100 cm — 12 — Fixed Insect Screen

## What Changes as Scale Grows

Whatever the quantity, the contact stays the same — what changes is the production and shipment plan.

20–50 units

### Single Batch

One measurement list, one deadline. When production finishes, a single dispatch — packaging labelled per block or floor.

50–200 units

### Block by Block

Production is planned in block or floor order. The ready batch ships without waiting; site installation does not lag behind.

200+ units

### Phased Programme

After sample approval, production and shipment are bound to a schedule. Container-level door-delivery organisation is run for international addresses.

Writing a project spec? Ready paragraphs are on the [Specification Documents](https://www.fenetresystems.com/en/specification-documents/) page; requests below 20 units are relayed via the [Price Quote](https://www.fenetresystems.com/en/get-a-quote/) form.
