Project Request
Orders of 20 units and above are run with the project team. The measurement list and project information are relayed in a single form.
Directly with the Project Team
A bulk order is discussed not on the general quote line but with the team that plans production. The moment the measurement list arrives, the job takes its place on the production calendar — no middle tier, no commission layer.
250+
Completed projects
550 m²
Monthly serial production
15 years
Parts supply commitment
- A sample is sent before serial production; the approved model becomes the project standard.
- Products are labelled and packaged per block, floor or room.
- Shipment is phased-planned; international orders are delivered to the door.
- The seven steps of the process are described on the Our Projects page.
How Your Measurement List Should Look
A list sent in this format converts directly into a production plan. Excel or PDF is also accepted.
| Unit | Opening (W×H) | Qty | Product |
|---|---|---|---|
| Block A · 3rd floor | 120 × 140 cm | 24 | Pleated Insect Screen |
| Block A · 4th floor | 120 × 140 cm | 24 | Pleated Insect Screen |
| Block B · bathroom | 60 × 100 cm | 12 | Fixed Insect Screen |
What Changes as Scale Grows
Whatever the quantity, the contact stays the same — what changes is the production and shipment plan.
20–50 units
Single Batch
One measurement list, one deadline. When production finishes, a single dispatch — packaging labelled per block or floor.
50–200 units
Block by Block
Production is planned in block or floor order. The ready batch ships without waiting; site installation does not lag behind.
200+ units
Phased Programme
After sample approval, production and shipment are bound to a schedule. Container-level door-delivery organisation is run for international addresses.
Writing a project spec? Ready paragraphs are on the Specification Documents page; requests below 20 units are relayed via the Price Quote form.
